1. Setup
- Rooms and areas to be painted are scheduled with the customer.
- Large furniture is moved into the center of the room.
- Wall and ceiling fixture are removed.
- Furniture is covered with plastic.
- Floors are covered with drop cloths.
|
|
2. Preparation
- Walls are scuff-sanded.
- Holes and cracks in walls are filled.
- Gaps in trim are caulked.
- Stains, such as water marks, are sealed.
- Washing is done where required.
|
|
3. Painting
- Repaired areas are primed.
- Paint is applied with a brush, roller or sprayer depending on the surface.
- Ceiling and walls are painted to proper coverage and finish color.
- Clean cut lines between trim & walls.
- Only premium quality Sherwin-Williams paints are used.
|
|
4. Clean-Up
- Furniture is moved back to original positions.
- Wall and ceiling fixtures are replaced.
- Floors and carpets are thoroughly vacuumed and swept.
- All garbage is removed.
- Touch-up paint is labelled and left with the customer.
|
|
5. Inspection
- Before the crew packs up their equipment, a "walk-around" is done to ensure all contracted areas are painted properly.
- Final touch-ups are noted & are completed before the crew leaves.
- After the crew leaves, another "walk-around" is done with the customer.
|